Gyproc / Egypt
20.05.2024
Mining Turkey 2024 Fair
05.05.2024
Bentonite Plant in Edirne / Enez - Silo and Pneumatic System Installation
18.04.2024
Turnkey Construction Chemical Plant Installation
15.10.2023
Egypt Miniplant Construction Chemical Plant
18.05.2023
Our stand took its place at the Mining Turkey 2022 fair held in Tüyap between 15-18 December.
15.12.2022
Mill Platform Stair Landing Revision Manufacturing and Installation Procedures
25.11.2022
Interview About Turnkey Projects
15.11.2022
7th Central and South European Drymix Mortar Conference
15.09.2022
4th International Food, Nutrition Components, Ingredients and Technologies Fair
25.05.2022
Karabiga Feeding, Dosing and Packaging System Manufacturing and Installation
15.05.2022
ICM System Installation and Commissioning
28.02.2022
Construction Chemical Plant Installation
22.11.2021
Did you see GKM's Virtual Showroom?
29.06.2021
The import of glazing tank and disc cabin
27.05.2021
Stock Silo and Dosing System
02.02.2021
Last Export of 2020
29.12.2020
Pneumatic Conveying Line Project Has Been Started in Unilever Konya Plant
28.09.2020
WKB Germany Slurry Mixing Agitator Manufacture Completed
22.06.2020
Ytong Georgia Slurry Mixing Agitator and Mixer Unloading Manufacture Completed
20.04.2020
Assembly of Additional Investments are Ongoing in Clariant Fatsa Factory
16.02.2020
Uniprom Steel Construction Export is Ongoing
20.01.2020
Kale Seramik Hydrocyclone Pilot Plant Has Been Completed
26.11.2019
First Slurry Mixing Tanks and Casting Moulds Export to Germany
28.08.2019
Turkish Ytong Block Adhesive and Plaster Production Facility Installation Completed
01.01.2019
Lime, Gypsum and Broken Block Grinding Plant was Commissioned with Pendulum Mill
25.12.2018
Sand Feeding and Krebs Hydrocyclone System is Started-up
30.11.2018
Engineering Project of BASF Resin Factory Revisions Has Been Completed
30.11.2018
Saint Gobain Weber Bitumen Based Insulation Product Plant is Started-up
31.01.2018
Multiple Decks Silica Sand Screening Machine Installation Has Been Completed
28.04.2016
Turn-Key Project of AB Gıda Mono Calcium Phosphate and Di Calcium Phosphate Production Plant
27.11.2015
Ytong Çatalca Block Production Facility Mixing Tanks and Mixer Tower Installation Completed
25.11.2015
Installation of 13 Screening Units for Enamel Frit with Cut Point 150 Micron
28.10.2015
19.03.2015